The single piece construction allows DK to give a 10-year warranty on seepage and water proofing. The pool, which comes complete with pump, filter and maintenance accessories, is installed within 4 days from delivery in deal weather and landscape conditions. DK Pools are distributed in Peninsular Malaysia trough qualified and trained installers in major cities.

 

Variety of design - type "Langkawi"

Accessories: UV-C Sterilizer

1. High reduction in combined chlorine levels

2. Less use of other chemicals for water control

3. No red eyes or skin irritation

4. No problems for people with asthma or allergies

5. No more chlorine gas and smell

6. Lower cost in chemicals, energy and maintenance

7. Improved water clarity

8. Clean and fresh water

9. Better for the environment and for your systems

  UV-C Sterilizer

Variety of design - type "Pangkor"

 

Optional: Pool Coper & Tiles

      

Variety of design - type "Tioman"

Pool System Diagram:

 

The pool also includes a UV-C sterilizer, one of the latest water-treatment developments, which reduces the need of chlorine by approximately 50%.

 Quality:

  1. Can be installed within days – not months

  2. Is the most cost-effective to buy, run & maintain

  3. One – piece moulding

  4. No need for chemical acid washing or resurfacing

  5. Uses fewer chemicals, making the water kinder to eyes and skin as well as the environment

  6. Has a smooth gel coat surface, but options are available with tiled surface

  7. Seamless and non-porous gel coat surfaces resistant to algae and bacteria

  8. Is a sound investment adding value to your property

Durability: During recent years, construction techniques have been refined and perfected and the pool shells offer greater strength and flexibility, UV, water and impact resistance as well as a smoother surface and the very latest in electrical and mechanical components and accessories. We assure that our pools are precision-built under strict factory conditions using only high quality fibres and resins. Every pool has been checked and approved by our quality technicians.

Accessories: Pool, filter, pump, skimmers, lighting and maintenance kit.

Efficiency: A concrete swimming pool takes about 8 weeks to install and this can disrupt your life and landscape. DK Pools can be installed within 4 days in ideal weather and landscape conditions, which keeps the disruption and inconvenience minimal. How is that possible? We do all the hard works before you purchase and all pools are checked by our quality technicians before they leave the factory.

Easy Care and Low Maintenance: Maintenance is a necessary fact to keep your pool clean and hygienic. Compared with traditional concrete pool, fiberglass pool’s maintenance and long term costs are greatly reduced.

 

     
   

DK Composites Sdn Bhd

(formerly known as Dian Kreatif Sdn Bhd)

Composites Tech City

Batu Berendam Airport

75350 Melaka, Malaysia.

 

Gen. Tel : +60 6 317 7928

Gen. Fax : +60 6 317 7929

info@dkpools.com.my

Copyright © dk Composites Sdn Bhd